Road rehabilitation works with earthmoving equipment in Kenya

Our services

Road Works and Civil Works

Jortin Limited is an NCA 8 registered road works contractor. We build and rehabilitate roads that keep people and goods moving, and we treat earthworks, grading and drainage with the same care as the running surface, because good drainage is what makes a Kenyan road last through the rains.

Road work in Kenya fails first at the shoulders, culverts and outfalls, not only on the carriageway. We take on access roads, estate roads, rehabilitation and drainage, within the limits of our NCA 8 road works class.

A road is a drainage system with a surface on top. Shoulders, side drains, culverts and outfalls are built before the finishing layer, because water is what usually destroys a Kenyan road, not traffic alone.

Rehabilitation starts with finding out why the road failed. We walk the alignment, note where water ponds and where the surface has broken, and repair the cause as well as the surface, so the same failure does not return in the next rains.

Plant access and traffic for residents or pupils are part of the method, not an afterthought. We plan how material arrives, how spoil leaves, and how the road stays passable where the brief requires it.

We will not describe this as a national-highway practice. NCA 8 is a defined class, and we stay inside it.

Scope

What this covers

  • Road construction and rehabilitation, to the specified pavement layers and finish.

  • Earthworks, excavation, filling, compaction and grading.

  • Drainage systems, stone pitching, side drains, culverts and outfalls.

  • Access roads, driveways and perimeter pavements for housing, institutions and private developments.

  • Related civil works that belong with the road: setting out, drainage structures and simple road furniture specified in the works.

Working with us

How Jortin handles road works and civil works

Road jobs fail in the drains long before the wearing course fails. We walk the alignment, confirm scope against NCA 8, build earthworks and drainage first, and leave a running surface plus a record you can file.

  1. 1

    Walk the alignment

    We note drainage paths, services, plant access and existing failures on the road you want built or rehabilitated.

  2. 2

    Scope and method in writing

    Earthworks, drainage and pavement layers are priced in the order they will be built. If a design or county specification applies, we build to it.

  3. 3

    Set-out and earthworks

    Width, level and camber are established before spoil is moved. Compaction and layer works follow the agreed specification.

  4. 4

    Drainage before surfacing

    Culverts, side drains and outfalls are installed so water has somewhere to go in the rains.

  5. 5

    Surface, tidy-up, records

    Wearing course and shoulders are completed, the site is left clean, and you receive notes and levels for your engineer or your file.

FAQ

Questions

What does NCA 8 mean for the size of road you can build?

It is a National Construction Authority class with defined limits. We will compare your scope to that class at the outset and tell you honestly if the job sits outside it.

Do you only work in Ongata Rongai?

We are based there, in Kajiado County, and we take on road and access work in Nairobi, Kajiado and other Kenyan locations where the job fits our class and our capacity.

Can you work under a supervising engineer?

Yes. We are used to building to a specified design and to opening the work for inspection at agreed hold points.

What do you need in order to quote?

A location, an indication of length and width, photographs or a walkover, notes on drainage problems, and any existing design or specification. A site visit is the most reliable start.

Send the location and a short brief

If you have an access road, a rehabilitation job or a drainage problem on a road you already use, send the location and a short brief. We will tell you whether it sits inside our NCA 8 road works class and how we would approach it.

WhatsApp Us