Issue and pre-start check
Issue and pre-start check
We confirm the structural drawings for construction, set grid and levels, and raise clashes or missing details in writing before excavation starts.

Our services
The structure is the part of a building you cannot afford to get wrong. Jortin Limited builds foundations and reinforced concrete frames exactly to design, with engineer-led checks on reinforcement, formwork and concrete at every critical stage.
Foundations and the frame carry everything that follows. We build for private clients, architects and engineer-led teams across Nairobi and the wider metropolitan area, as the structural contractor on your job or as part of a wider build team.
Concrete does not forgive carelessness. Reinforcement is checked against the bar schedule before the pour, formwork is checked for line, level and support, and concrete is tested where the specification calls for it. Every critical stage is inspected before it is covered up.
Where the design depends on ground conditions, we arrange or coordinate the site investigation, so the foundation type rests on data rather than assumption. We build to the approved drawings, and when a drawing and the site disagree, we raise it in writing before we build.
On mixed teams we keep the interface with masonry and services explicit, so starter bars, block bonds and sleeve locations are agreed before the next trade is on site.
The drawings, the bar schedules and the inspection points are the job, not a vague labour package.
Scope
Foundations: pad, strip, strap and combined footings, set out and built to the approved drawings.
Reinforced concrete columns, beams, slabs and staircases, with attention to cover, laps, chairs and construction joints.
Structural steel works and engineered formwork, where the design calls for them.
Site investigation support and geotechnical assessment, arranged or coordinated when the design depends on ground data.
Civil elements related to the structure, such as ground beams, retaining and other designed concrete works that sit with the frame.
Working with us
Structural work moves through agreed hold points. We set out from the issued drawings, inspect before steel and concrete disappear behind formwork, and only release the frame when the next trade has what it needs to start cleanly.
We confirm the structural drawings for construction, set grid and levels, and raise clashes or missing details in writing before excavation starts.
Excavation, blinding and reinforcement are checked against the schedule. Anchor bolts and starter bars are signed off before any pour.
Columns, beams, slabs and stairs follow a programme agreed with the site team. Formwork, props and pour order are planned, not decided on the day.
A qualified civil and structural engineer reviews the stages that matter, not only the foreman. Testing is arranged and recorded where the specification requires it.
You receive a record of what was built, agreed variations, and the condition of starter bars, sleeves and surfaces for masonry or services.
FAQ
We can. Consultancy and Design is a separate service if you need drawings and calculations first. If you already have an engineer of record, we will build to that design and raise queries formally, rather than changing the scheme on site.
Critical structural stages are checked and signed off by a qualified engineer, at a frequency we agree at the start.
Issued-for-construction drawings, or a clearly marked tender issue, the site location, and any geotechnical information already obtained. If those are incomplete, we will help you list the missing items.
Yes. Many jobs are delivered that way, with masonry and finishes handled by others.
Share the structural drawings or the brief for your foundations and frame. We will review the scope, tell you what is missing, and propose a clear way to build it.