Reliable water changes daily life in schools, health centres, homes and communities. As an NCA 8 registered water works contractor, Jortin Limited drills and equips boreholes, installs reticulation and storage, and builds sanitation infrastructure intended for long service in Kenyan conditions.

Water work only holds together if siting, drilling, pumping, storage and distribution are treated as one system. We deliver for private clients, institutions and communities across Nairobi and its environs, within our NCA 8 water works class.

A borehole is only one part of a water system. The pump must match the tested yield, the rising main and storage must match the demand, and the reticulation must deliver the water to where it is actually used. We design and build these parts as one system so they do not fight each other.

Where grid power is unreliable, solar pumping is often the practical choice, and the panels, controller and pump are sized against the test results rather than a catalogue claim. Handover includes an explanation of how the system works and what routine care it needs.

Commissioning means a test run with you present: flow at the tap, tank levels, pump cut-in, and what to check after the first heavy rain on the drainage that serves the system.

Scope

What this covers

  • Borehole drilling and development, followed by test pumping so the yield is known before equipment is chosen.

  • Solar or electric pump equipping, matched to the tested borehole and the demand.

  • Water reticulation networks, household or institutional connections, and community water kiosks where they are specified.

  • Elevated steel or masonry storage tanks, including tower structures of the kind shown in our own site photography.

  • Sanitation, septic systems and drainage infrastructure that belongs with the water system.

Working with us

How Jortin handles water and sanitation

Water work is scoped as one system: source, pumping, storage and distribution. Test pumping comes before pump selection, permissions are listed before the rig mobilises, and you see the system run at commissioning.

  1. 1

    Demand and site reality

    We confirm who needs water, the likely demand, site constraints, and whether to start with drilling, storage, reticulation or sanitation.

  2. 2

    Permissions and written scope

    Siting and consents are identified early, with a clear line on what you apply for, what we coordinate, and what must be in place before drilling.

  3. 3

    Drill, develop, test

    Development and test pumping produce yield data before equipment is bought.

  4. 4

    Equip as one system

    Pump, controls, rising main, tank and reticulation are installed and pressure-tested together.

  5. 5

    Commission with you present

    We run the system with you, explain routine care, and note maintenance options after handover.

FAQ

Questions

Can you guarantee that a borehole will find water?

No responsible contractor can guarantee yield before drilling and testing. We will discuss siting and risk, then let the test pumping speak.

Do you do solar and electric equipping?

Yes. The choice depends on power availability, demand and the tested yield. We will recommend on that basis, not on a single preferred product.

What permits are required?

Requirements vary by location and by the nature of the works. We will list the typical consents for your site at the proposal stage and agree who is applying for each.

Can you install only the tank or only the reticulation?

Yes, if the existing borehole and pump data are known and adequate. If they are not, we will say so, because a new tank cannot fix a weak source.

Send the site and the demand

If you need a borehole, a storage tower, reticulation or sanitation works in Kenya, send the site location and a short description of the demand. We will advise on scope, on our NCA 8 water class, and on the practical next step.